A new survey has revealed the poor condition of school buildings in Khyber Pakhtunkhwa. According to the KP Elementary and Secondary Education Department, 4,049 government schools need immediate reconstruction or rehabilitation. The KP government schools repair plan is estimated to cost Rs16.2 billion and covers thousands of classrooms, toilets and exam halls.

The survey was carried out after a tragic incident in Peshawar’s Dir Colony, where a private school building collapsed and killed 31 students and a female teacher. Since then, the safety of students and teachers has become a top concern for the provincial government.
Also Read: FPSC New Test Dates 2026 Announced for Postponed Peshawar and D.I. Khan Tests | NTU Jobs 2026 – Professor, Lecturer and Admin Posts at National Textile University
KP Government Schools Repair: Key Figures
| Item | Figure |
|---|---|
| Schools needing repair | 4,049 |
| Classrooms to be rebuilt or repaired | 8,088 |
| Group toilets | 2,949 |
| Examination halls | 48 |
| Estimated cost | Rs16.2 billion |
District and tehsil education offices conducted the survey. Both boys’ and girls’ schools are included in the list.
District-Wise Situation of Dangerous School Buildings in KP
The survey shows that dangerous school buildings KP wide are spread across many districts. Some of the worst-affected districts are:
| District | Schools | Key work | Estimated cost |
|---|---|---|---|
| Swat | 488 | 518 classrooms, 301 washrooms, 5 exam halls | Rs1 billion |
| Mardan | 350 | 728 classrooms, 272 washrooms | Rs1 billion |
| Haripur | 332 (130 girls, 202 boys) | 811 classrooms, 336 washrooms, 5 exam halls | Rs1 billion |
| Lower Dir | 271 | 689 classrooms, 128 washrooms, 1 exam hall | Rs1.48 billion |
| Abbottabad | 245 (130 girls, 115 boys) | Rehabilitation work | Rs1.098 billion |
| Charsadda | 174 | 430 classrooms, 23 group toilets | Rs874.7 million |

ESEA Private School Inspection Drive
The government has also directed the Elementary and Secondary Education Authority (ESEA) to inspect private school buildings across the province. Under the ESEA private school inspection drive, more than 6,000 of the 12,493 private schools registered with the Private Schools Regulatory Authority have already been checked. Officials say the remaining inspections should be completed within about a week.
Private schools found operating in unsafe buildings may be asked to repair, shift or close until the building is declared safe.
What This Means for Teachers and Students
For teachers, this is both a safety issue and a teaching issue. Broken classrooms, leaking roofs and missing toilets make it hard to run classes, especially for girls’ schools. School rehabilitation Khyber Pakhtunkhwa wide can improve attendance, reduce dropouts and give teachers a safer working environment.
- Head teachers should report cracks, weak roofs or damaged walls to the district education office in writing
- Teachers should avoid using rooms that look unsafe until they are inspected
- Parents can contact the school management council (PTC) to raise safety concerns
- During repair work, schools may use shifts or temporary rooms

What Happens Next?
The education department will now need funds from the provincial budget or development programmes to start the work. Priority is expected to be given to schools in the most dangerous condition and to girls’ schools where facilities are very poor. Teachers and parents should keep an eye on district education office notices for repair schedules.
KP Government Schools Repair and Teacher Safety
The KP government schools repair survey is the most detailed picture so far of how many buildings need attention. Many of these schools were built decades ago and have not been maintained properly. Floods, earthquakes and heavy rains have also weakened walls and roofs in several districts.
For the KP government schools repair programme to succeed, work must be monitored closely so that funds are spent on real repairs and not just paint jobs. Teachers, parent-teacher councils and local communities can play an important role by reporting progress and quality issues.
Girls’ schools need special attention in the KP government schools repair plan, because missing toilets and boundary walls are among the main reasons girls drop out of school.
Frequently Asked Questions (FAQs)
How many KP government schools need repairs?
The survey identified 4,049 government schools that need urgent reconstruction or rehabilitation.
How much will the repairs cost?
The estimated cost is Rs16.2 billion.
Which district has the most affected schools?
Swat has the highest number with 488 schools in poor condition.
Are private schools also being checked?
Yes. ESEA has inspected over 6,000 of 12,493 registered private schools, and the rest will be checked soon.
Official Source and Related Updates
For official notices and updates, visit the Elementary and Secondary Education Department Khyber Pakhtunkhwa. Always confirm dates and details from the official source before taking any action.
Also Read: Punjab School Outsourcing Phase 4: 6,460 Schools Including High Schools
Conclusion: The KP government schools repair survey shows how urgent school safety has become. Quick funding and transparent work can protect thousands of students and teachers. Stay with STI Portal for more education news from all provinces.


